Nene Park Academy

The project involved completely removing the current single-ply waterproofing system and replacing it with a new Alumasc three-layer system. This included installing tapered insulation and applying all layers using hot air. Additionally, new permanent edge protection/handrail and PV panels were installed.

Brickwork repairs were necessary. Since the building was new, it adhered to updated regulations that were different from those we encountered in previous refurbishment projects. These regulations included insulated parapet upstands. To accommodate this, we had to mechanically attach insulation to the vertical face, which also led to changes in the trim and drip detail. Additionally, adjustments were made to the lightning conductor system to account for the original metal capping. Raising the roof height with new insulation meant that the parapet was no longer tall enough, necessitating the installation of permanent edge protection.

Related Projects

Fountain Court Police HQ

Pitched roofs / Projects / Roofing

Fountain Court Police HQ
View Project

Oakwood Primary School

Education / Flat Roofs / Pitched roofs / Projects / Roofing

Oakwood Primary School
View Project

30-60 Baker Street

Pitched roofs / Projects

30-60 Baker Street
View Project

Get In Touch

Please note: by completing this form, you accept that M&J Group may contact you from time to time about services which might be of interest to you. You may unsubscribe from these emails at any time and we will never share your information.