Clifton School

Attention to detail was a must, given the building’s status in a conservation area. All slates had to be double lapped, with Klober dry ridge and hip details throughout. All re-used slates were positioned on the sections of roof that could be best viewed from the public (Front entrance, side section adjacent to main road etc).

Workmanship was of an extremely high quality, with the client commenting that it was the best slate roof he had ever had the pleasure of dealing with. Attention to detail was a must, given the building’s status in a conservation area. All slates had to be double lapped, with Klober dry ridge and hip details throughout. All re-used slates were positioned on the sections of roof that could be best viewed from the public (Front entrance, side section adjacent to main road etc).

M&J repointed and formed new lead details around the Bell Tower as part of the works, restoring it back to its original grand state. Lead detailing was also used on the plinths and valleys

All fascias and soffits were decorated alongside the re-roofing works.

Related Projects

Fountain Court Police HQ

Pitched roofs / Projects / Roofing

Fountain Court Police HQ
View Project

Oakwood Primary School

Education / Flat Roofs / Pitched roofs / Projects / Roofing

Oakwood Primary School
View Project

30-60 Baker Street

Pitched roofs / Projects

30-60 Baker Street
View Project

Get In Touch

Please note: by completing this form, you accept that M&J Group may contact you from time to time about services which might be of interest to you. You may unsubscribe from these emails at any time and we will never share your information.