The Oakwood Primary School project involved the full refurbishment of both pitched and flat roof areas across the site. Delivered as part of Southampton City Council’s estate improvement programme, the objective was to resolve historic leaks, improve thermal performance in line with Part L regulations, and enhance the building’s long-term resilience. All works were carefully planned to minimise disruption, particularly during term time, and were completed ahead of programme. 

Project Scope 

  • Replacement of all flat and pitched roofing systems 
  • Improved insulation to comply with Part L building regulations 
  • Solar panel removal and reinstatement 
  • Rooflight and window refurbishment 
  • Internal finishes  
  • Associated drainage and CCTV surveys 

Key Works Completed 

  • Pitched Roof Works: We removed the old roof coverings and insulation and installed new Redland Regent roof tiles. The roof was upgraded with modern insulation, improved ventilation, and fire safety features to meet current building standards. New facias, soffits, guttering, and leadwork were also installed. 
  • Flat Roof Works: All flat roof areas were stripped and rebuilt using high-performance insulation and a flame-free waterproofing system. One flat roof area (Roof 4) was fully demolished and rebuilt, including internal finishing such as plastering, lighting, and painting. 
  • Solar Panels: Existing solar panels were carefully removed, safely stored, tested for performance, and reinstalled with new fixings to suit the updated roof. 
  • Window and Rooflight Refurbishment: Several windows above Roof 4 were replaced to fit the new roof height and match the original design. A large rooflight in the staff room was also refurbished, including full internal decoration to leave the space clean and finished. 
  • CCTV and Drainage Surveys: We carried out CCTV inspections and cleared the drainage systems to ensure long-term performance and prevent future blockages. 

Challenges 

The main challenge was working within a live school environment. The project team carefully scheduled noisy or intrusive works during school holidays, weekends, or off-peak hours. Detailed planning and early engagement with school staff allowed lessons and operations to continue without disruption. Additionally, the project was completed 11 weeks ahead of schedule, allowing the school to begin planned internal works earlier than expected. 

Outcome 

The project successfully delivered a full roofing upgrade across the school, providing a safe, watertight, and well-insulated environment. High standards were maintained throughout, with both external and internal finishes completed to a professional level. Stakeholder satisfaction was achieved through clear communication, flexibility, and timely delivery. 

Client Testimonial

“Say a huge thank you to you and everyone at M&J for the amazing work you did on our school roof…Please pass on our gratitude to all the builders, roofers and everyone else who helped. You worked so hard without disturbing the life of the school and we really appreciate it” – Year 6 Pupils

Related Projects

Fountain Court Police HQ

Pitched roofs / Projects / Roofing

Fountain Court Police HQ
View Project

Oakwood Primary School

Education / Flat Roofs / Pitched roofs / Projects / Roofing

Oakwood Primary School
View Project

30-60 Baker Street

Pitched roofs / Projects

30-60 Baker Street
View Project

Oakwood Primary School

Get In Touch

Please note: by completing this form, you accept that M&J Group may contact you from time to time about services which might be of interest to you. You may unsubscribe from these emails at any time and we will never share your information.